Application Briefs

  • MULTI-CONDUCTOR CABLE HIPOT AND CONTINUITY TEST SYSTEM

    Emerging Technologies, LLC. was called upon to provide a replacement multi-conductor cable test system. An existing test system was in place and failing due to age.

    Click the image for more info.

  • AUTOMATIC TRANSFER SWITCH TEST SYSTEM

    Emerging Technologies, LLC. was called upon to develop and build a pair of functional test systems for a new addition to an existing line of automatic transfer switches including single phase and three phase units. Additionally, the customer required the new systems be backwards compatible with existing products.

    Click the image for more info.

  • SERVO BASED DUT ROTARY CYCLING SYSTEM

    Emerging Technologies, LLC. was called upon to develop and build a servo-based DUT cycling system to replace an existing pneumatic cycling system. The existing DUT safety enclosure was to be re-used and interfaced by the new system. The purpose of the system is to cycle the DUT for a minimum number of cycles for the purpose of both breaking and detection of infant mortality. The interest in servo-based cycling stemmed from the need to eliminate the significant air consumption required by the original pneumatic cycling system. 

    Click the image for more info.

  • SWITCH FORCE SUB-ASSEMBLY TEST SYSTEMS

    Emerging Technologies, LLC. was called upon to build an automated switch force sub-assembly test system from a customer provided design. The DUT switch contacts were to be verified for force, position, and electrical state while being automatically actuated by the test system. 

    Click the image for more info.

  • MICROCONTROLLER-BASED SUB-ASSEMBLY TEST SYSTEM

    Emerging Technologies, LLC. was called upon to design and build an automated sub-assembly test system. The DUT was to be configured, calibrated, and functionally tested.

    Click the image for more info.

  • PRESSURE LEAK TEST SYSTEM

    Emerging Technologies, LLC was called upon to design and build a custom Pressure Leak Test System. The system was required to pressure the device under test and verify the pressure was maintained within specification over a period of time. The system was planned as standalone system to leak test two different part numbers of sheet metal product. 

    Click the image for more info.

  • HIGH PRESSURE LEAK TESTER

    Emerging Technologies, LLC was called upon to design and build a custom High Pressure Leak Test System. Leakage flow monitoring of less than 25CCM was required. The system was planned as standalone system to leak test DUT galleries, adjacent to exterior surfaces, for leakage at pressures up to 60PSI.

    Click the image for more info.

  • ELECTRO-MECHANICAL SUB-ASSEMBLY TEST SYSTEM

    Emerging Technologies, LLC. was called upon to design and build an Electro-mechanical Sub-assembly Test System capable of testing eight separate units simultaneously and independently.

    Click the image for more information.

  • AUTOMATED DEFLECTION DURABILITY TEST FIXTURE

    Emerging Technologies, LLC was called upon to develop a custom durability test system to create many cycles of, manually adjustable deflection, of multiple plastic parts. The fixture was to be operated while submerged in a chilled water tank. The system was to be kept as rudimentary as possible and was to be used for a single two week durability test.

    Click the image for more info.

  • DUPLICATE ASSEMBLY CARTS

    Emerging Technologies, LLC. was called upon to provide nine additional Automated Assembly Carts, duplicate to the prototype previously developed by Emerging Technologies. 

    Click the image for more info.

  • AUTOMATED ASSEMBLY CART

    Emerging Technologies, LLC. was called upon to design and build an automated assembly cart. The cart design was to include the ability to rotate clockwise and counter clockwise, as well as raise and lower to accommodate different product models and operator height and working preferences. 

    Click the image for more info.

  • OVERLOAD RELAY END OF LINE TEST SYSTEM

    Emerging Technologies, LLC. was called upon to design and build an End Of Line test system with laser marking. The DUT was to be configured, tested, and marked. 

    Click the image for more info.

  • END OF LINE TEST SYSTEM

    Emerging Technologies, LLC. was called upon to develop and build an EOL Test System. The system runs an automated test sequence to validate a DUT that has been completed on an assembly line. 

    Click the image for more info.

  • BURN-IN TEST SYSTEM

    Emerging Technologies, LLC. was called upon to develop and build a 20 Station Burn in Test system. The System needed to be capable of running 10 Pairs of DUTs. All 20 tests run Simultaneously while each pair sharing a load between the two systems. The system is capable of running over a multi-hour period to validate the DUTs.

    Click the image for more info.

  • 1,100 AMP VARIABLE MOBILE AC CURRENT SOURCE

    Emerging Technologies, LLC has been called upon, on numerous occasions, to provide an AC current source as part of a test system design. This particular current source required 1,100 amps with a minimum compliance voltage of 4VAC. 

    Click the image for more info.

  • HALL EFFECT SENSOR CALIBRATION SYSTEM

    Emerging Technologies, LLC. was called upon to develop a calibration system based on an existing customer prototype. The system was to calibrate Hall Effect sensors with ranges from 37A to 420A

    Click the image for more info.

  • HIGH SPEED DAQ AND CONTROL SYSTEM

    Emerging Technologies, LLC. was called upon to generate a functional specification for and develop a high speed data acquisition and control system for a high current test lab. The specifications required the system utilize off-the-shelf technology where possible. The system was required to measure and control events drawing up to 80k amps at up to 800VAC.
  • CUSTOM CONFIGURATION READER INTERFACE

    Emerging Technologies, LLC. was called upon to develop an interface that could provide communication between a customer supplied device and a host computer. The interface also needed the ability to control the device I/O via RS232 request from the host computer. The MCU on the interface was programmed to put the device into communication mode using a proprietary synchronous communication. Data is read back from the device using a proprietary asynchronous variable baud rate communication. The information is then communicated with the host computer using standard asynchronous serial communication.
    Additionally this interface utilizes optical isolation between the host computer and the device.

    Click the image for more information

  • TILTING FIXTURE FUNCTIONAL TEST SYSTEM

    Emerging Technologies, LLC. was called upon to design and build a functional test system with a tilting fixture. Cost was to be kept down by designing a manually operated system with the capability to be automated in the future.

    Click the image for more info.

  • MANUAL TEST CONSOLE

    Emerging Technologies, LLC. was called upon to build a manual version of an automated test system control console previously provided by Emerging Technologies. The new system was to be built at a reduced cost by reducing size and automation components. The majority of the functionality would remain through manual operations and the connection of a notebook computer provided by the customer. The power system and DUT fixture were provided by the customer. 

    Click the image for more info.